Send Message

1100×1100mm Multi Layer 8kw Flute Laminator Machine

Basic Information
Place of Origin: China
Brand Name: PRINTYOUNG
Certification: CE
Model Number: YB-1100B
Minimum Order Quantity: 1 Set/Sets
Price: Negotiable
Packaging Details: wooden case each Flute Laminating machine
Delivery Time: within 40 days
Payment Terms: L/C, T/T
Supply Ability: 10sets per month
Max Size: 1100×1100mm Min Size: 350×350mm
Power: 8kw Speed: 0-90m/min
Weight: 3000kg Machine Size: 8000×1770×1750mm
Highlight:

Multi Layer Flute Laminator Machine

,

8kw Flute Laminator Machine

YB-1100B Semi-automatic 3000kg Multi-layer Flute Laminating machine

 

Function description:

 

1. Using suction feeding automatic of bottom sheet, according to the main machine operating speed, continuous automatic tracking

2. The humanized design that manually feeding from the front makes delivery more easier and efficient.

3. Entire new concept, front gauge registration, position high accuracy, bottom sheet never exceeds the top sheet.

4. Machine uses touch-screen / PLC control system, the circuit system is stable, and can automatically display the failure alarm

5. The automatic replenishment system of glue can be added automatically during glue losses, and recycling with the glue to avoid loss of waste;

6. The scientific design of the metering roller speed to ensure the glue evenly on the same time, to avoid rejection of glue at high speed.

7. Floating removable press, to ensure that laminated paper will not be crushed, and also keep the cardboard smooth and straight; unilateral adjustment by way of adjustment worm roll lamination pressure for quick.

8. Control of water tank cleaning cycle using an independent method, clean, hard rubber product;

9. Suitable for color top sheet 175-500g and A/B/C/D/E/F corrugated paper laminating;

Color top sheet 175-500g and grey cardboard paper laminating

 

Technical data:

Model Max Size Min Size Power Speed Weight Machine Size
PRY-1100B 1100×1100mm 350×350mm 8kw 0-90m/min 3000kg 8000×1770×1750mm
PRY-1300B 1300×1250mm 350×350mm 8kw 0-90m/min 3500kg 8000×1970×1750mm
PRY-1450B 1450×1250mm 350×350mm 9kw 0-90m/min 4000kg 8000×2020×1750mm
PRY-1650B 1650×1300mm 350×350mm 11kw 0-90m/min 4500kg 8000×2250×1750mm

 

Configuration

1100×1100mm Multi Layer 8kw Flute Laminator Machine 0

 

 

1100×1100mm Multi Layer 8kw Flute Laminator Machine 11100×1100mm Multi Layer 8kw Flute Laminator Machine 21100×1100mm Multi Layer 8kw Flute Laminator Machine 31100×1100mm Multi Layer 8kw Flute Laminator Machine 41100×1100mm Multi Layer 8kw Flute Laminator Machine 5

FAQ:

Q1: Are you a manufacturer or a trading company?

A: Our shanghai office is mainly doing export. We have our own factory in Wenzhou, Zhejiang Province.

Q2. What is the machine warranty?

A: One year. After the warranty, we still provide technical support to buyer at low cost.

Q3. What is the production time while placing order?

A: Normally about 10-20 days.

Q4. What is the delivery time?

A: 15-30days after deposit.

Q5. Can your company handle shipping for customers?

A: Yes, just give us destination sea port or container yard.

Q6. Does the packing strong?

A: Yes. Adopts moisture-proof and shock-proof packaging which is suitable for long-distance road transportation and various types of weather conditions. A full set of maintenance and operation manuals is included..

Q7. How about the machine installation and training ?

A: 1)We provide training in our factory for free; 2)We can send technicians (engineers) to your factory for installation and training. You shall pay the round trip air fare and accommodations, plus each technician charges USD100/per day.

Q8. Do you have machines in stock?

A: For standard model, we have a large quantity in stock. For special model, we need 20-30 days to produce it for you.

Q9. How can you assure the machines’ quality?

A: Each machine will be test running at least 24 hours before delivery to assure the quality. And during the warranty, we will give spare parts for free if machine has any problem.

Q10. Do you inspect machines or test running before packing?

A: Of course we do. We have QC department to debug the machine before packing. If you want to use specific material to do the test running, you need to pay for the cost of the material

Q11. What’s the payment term?

A: T/T 50% in advance, the balance shall be paid before delivery. We also accept payment by West Union or L/C at sight.

Q12. Do you accept factory visiting?

A: Warmly welcome for your visiting.

Q13. How many years are you in printing field?

Contact Details
Ms Caren

Phone Number : +8613818020601

WhatsApp : +8613816748090